Office Relocation Checklist for a Twin Cities Move
November 24, 2026
Moving an office is a lot to manage. You still have your regular work to do, and the move has to be timed so everyone is out when your lease ends and settled into the new space without losing workdays.
Long before the moving truck shows up, you have an avalanche of details to manage to protect your operations and your profit. Since 1952, the Piepho family has provided trusted moving and storage services for businesses like yours. This office relocation checklist walks you through what to handle starting about 12 weeks before the move, so you know how to plan an office move without downtime. It also shows where our office movers can take work off your plate. For multi-floor or multi-site projects, our commercial moving team can manage the whole relocation.
Piepho is an Allied Van Lines agent, and Allied named Piepho its 2023 Agent of the Year. From downtown Minneapolis towers to suburban office parks, we handle office moves across the Twin Cities, and our team can plan yours.
Office relocation checklist at a glance
- Name a move manager and collect both buildings’ moving rules (12 weeks out).
- Order internet and phone service for the new space (10 weeks out).
- Return the new building’s move-in forms and your mover’s insurance certificate (8 weeks out).
- Take inventory and decide what moves, what goes to storage and what goes away (6 weeks out).
- File your business change of address with USPS (4 weeks out).
- Confirm the freight elevator and loading dock (2 weeks out).
- Have staff pack and label their desks (1 week out).
- Update the IRS, the state, and your online listings (after the move).
Build a 12-week office move timeline

This 12-week timeline is flexible and can stretch or shrink to fit your office. The most important thing is to assign an owner to every task so nothing gets forgotten or overlooked. If you’re also watching the budget, our tips to reduce office moving costs in Minneapolis cover the money side.
| Weeks before move | Task | Why it matters |
|---|---|---|
| 12 | Name a move manager, request quotes from office movers, and ask both buildings for their moving rules | Each building sets its own hours, dock and elevator rules (see the after-hours section below). |
| 10 | Order internet and phone service for the new space | Lumen quotes install times in business days from contract signing, as non-binding estimates. |
| 8 | Request move-in forms and insurance requirements from the new building | SPS Tower wants its forms at least two weeks before move-in, plus a certificate of insurance from your mover covering general liability, workers’ compensation and auto liability. |
| 6 | Take inventory, decide what moves, what gets stored and what gets sold or recycled, and announce the move date to staff | Fewer items means a smaller crew and truck. Corporate storage can hold furniture, files or equipment you’re not ready to place. |
| 4 | Submit your business change of address | USPS says to allow at least 7–10 business days after approval, and standard forwarding lasts 12 months. |
| 2 | Confirm the freight elevator and loading dock with building management | Capella Tower requires management to authorize freight elevator use before move-in. |
| 1 | Hand out packing supplies and labels, and have staff pack their desks | Labels that match the new floor plan let the crew place every box without stopping to ask. |
| After the move | Update the IRS and the state, and walk the old space with your landlord | Form 8822-B covers a changed business mailing address or location. |
You’ll notice the building paperwork comes due well before move day. Buildings such as SPS Tower and Capella Tower need it completed before they’ll let your movers in, and the sooner you finish it, the more time you have to fix any issues without missing your moving deadline.
Update the IRS, the state and the Postal Service
The IRS says a change of responsible party must be reported within 60 days. That rule is easy to mix up with the address change, since both go on Form 8822-B. The 60 days applies to the responsible party, not to your address, but file the address change soon after the move so IRS notices don’t go to your old office.
Mail is easy to overlook until letters start showing up at the old address, so give it its own line on the plan. If you file a business change of address in person at a post office, USPS asks for proof that you can act for the business, such as a notarized letter or a letter on company letterhead signed by someone in a leadership role.
Standard forwarding lasts 12 months, which gives you a full year to catch every vendor and client who still has the old address. You can also pay to extend forwarding by 6, 12 or 18 months (18 months of extra time is the maximum). When forwarding ends, USPS returns mail to the sender for 6 months with a label that shows your new address.
Your registered office (the address the state has on file for your business) is the other one to check, and it doesn’t have to match your main office. If it changes, Minnesota Statutes section 5.36 says the filing must state that the change was approved by resolution of a majority of the governing body present, so put the vote on your board’s agenda early. File the change with the Minnesota Secretary of State. This checklist is general information, not legal or tax advice, so confirm your filings with the IRS, the Secretary of State and your advisors.
Who needs to know about your office move?
Tell these groups early:
- Your employees, with the move date and what’s expected of them
- Your current landlord and the new building’s management office
- Your internet and phone provider
- USPS, the IRS and the Minnesota Secretary of State
- Your bank, insurance carrier and payroll provider
Clients and vendors can wait until the lease date is firm, but give them your new address and your first day open there as soon as you have both. On that day, also update your website, Google Business Profile and online directory listings so customers and delivery drivers find the new office, not the old one.
Organize IT and office furniture installation so staff can log in on day one

The part of the move your team will notice most is how soon they can get back to work. To get them back faster, finish your internet connection, your other technology and your office setup early.
First, order your internet early, since the install date sets the earliest day you can move. Lumen counts its install estimates in business days from the day you sign, and it treats them as targets, not guarantees. A site that needs network expansion, or hits delays Lumen can’t control, falls outside the estimate. In plain terms, a signed contract gets you an estimate, not a promise, so ask your provider for a committed delivery date in writing.
Second, back up your data before you pack your first box. CISA recommends the 3-2-1 rule: 3 copies of important files, on 2 different types of storage (like a hard drive and the cloud), with 1 copy stored off-site, away from your business location. Test your backups too, so you know your team can restore data, roll it back at least seven days, and reach critical files without an internet connection. If you’re moving servers or network racks, our data center relocation crew can handle that equipment.
Furniture comes last. Once your internet is on and your data is secure, you can place the furniture where you need it. Make as many of those decisions ahead of time as you can. For example, mark a floor plan of your new space with where every desk, monitor and cable should go. Our FF&E movers are a dedicated service line for packing, moving and installing furniture, fixtures and equipment.
Put it all together and the last two weeks look like this:
- Run a test restore from your off-site backup.
- Confirm your internet install date in writing.
- Label each workstation to match the new floor plan.
- Move servers, network equipment, phones and the IT desk first.
- Place the remaining furniture, then test every workstation before staff arrive.
How to prepare employees for the office move
Your team can make move day faster or slower, depending on how well they know the plan. A few steps keep everyone on the same page:
- Pick a move captain for each department. One person answers questions and checks that their area is packed and labeled.
- Use one labeling system. Give each box and piece of equipment a label with the floor, department and desk number from the new floor plan.
- Set a packing deadline. Ask staff to pack desk contents the day before the move and take personal items and valuables home.
- Share a first-day guide. Include the new address, parking, building access cards, skyway or entrance directions, Wi-Fi details and who to call if something isn’t working.
Plan for after-hours moves and building rules
Commercial moves usually happen after hours or on weekends because a move during the workday stops your team from working. Many office moves are scheduled around evenings, weekends, holidays or phased schedules to shorten the gap between the last day in the old office and the first day in the new one. When you compare office movers in Minneapolis, ask whether they can work evenings, weekends and phased schedules.
Your building has a say in when and how you move, so read its rules ahead of time. Downtown buildings can be strict. Capella Tower, for example, never reserves its freight elevator for exclusive use during business hours, and its loading dock has a 13-foot height limit and a 29-foot length limit. Dock limits like these decide which truck can even pull in, so check them early. If you send the building’s rulebook to your mover ahead of time, they can plan the crew and the truck and avoid surprises and delays on moving day.
When you read your building’s rules, look for these:
- Move hours and weekend rules
- Freight elevator booking, size and weight capacity
- Loading dock height and length
- Insurance certificate requirements for your movers
- Floor and wall protection rules (in a Minnesota winter, plan for snow and salt tracked in from the dock)
Office relocation FAQs

How far in advance should you plan an office move?
For most small and mid-size offices, 12 weeks is a workable minimum. Larger offices, multi-floor moves and moves that need a new network buildout should start planning six months or more ahead, because internet installs, lease dates and building approvals can each take weeks.
How long does the physical office move take?
A small office can often move over one evening or weekend. Larger offices usually move in phases over several nights or weekends, with IT equipment going first so each group can work as soon as it arrives.
How much does an office move cost?
Cost depends on how much you’re moving, the number of workstations, distance, floors and elevator access, after-hours labor, and how much furniture and IT setup the crew handles. The most reliable number comes from an on-site estimate. Our office moving cost tips show where you can save.
Do you need to tell the IRS when your business moves?
Yes. Use Form 8822-B to report a new business mailing address or location. If your responsible party also changes, that part must be reported within 60 days.
What should you do with office furniture you’re not taking?
Sell, donate or recycle what you no longer need before move day so you aren’t paying to move it. If you need to hold items during a phased move or until the new space is ready, use climate-controlled commercial storage.
Your office move, without the downtime
If you remember four things for your Twin Cities office relocation, make them these: start 12 weeks out, order your internet first, back up your data before you pack, and send each building’s rulebook to your mover early.
You don’t have to put the dates on this checklist alone. Piepho’s office moving team can plan the timeline, coordinate with both buildings, move after hours and set up your furniture so your staff can log in the next morning. Request a free commercial moving quote, read what our customers say, and let us put more than 70 years of experience to work for you.